Customization: | Available |
---|---|
Welding Range: | 315mm |
Cooling Way: | Air Cooling |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Details: Product Name: 315mm Pipe Hydraulic Butt Welding Fusion Machine Item No.: HDG-315 Welding Type: Hydraulic Pump Drive Brand Name: Neutral, HUAJIN or OEM Color: Red, Black and customized Guarantee: 2 years quality warranty and spare parts factory cost. MOQ: No MOQ Welding Introduction For HDPE: 1. Fix the proper clamps on the machine rack. 2. Put HDPE pipes on the clamps and tighten the bolts. 3. Mill the end of the HDPE pipes with the facer. 4. Put the heater plate on the machine rack and heat the pipes for proper time. 5. Remove the heater plate and connect the HDPE pipes. |
Before beginning any electrical work, it's important to prioritize safety measures. One of the first things you should do is PowerClose the ground fault interrupter to prevent any potential electrical accidents.
Next, if you are starting an oil pump, it's crucial to watch the rotating direction. A good way to do this is by checking the pressure gauge readings. If the readings are present, then it's likely that the rotation is right. If not, you may need to exchange any two live wires.
Overall, by taking these safety measures and ensuring proper installation, you can have a smooth and successful start to your electrical work. Remember, safety always comes first!
When it comes to checking and adjusting the drag pressure and move speed of the drag plate, there are a few things to keep in mind. First and foremost, the working pressure of the system should be at 6 MPa. This can be adjusted through the pressure regulation valve on the control panel, which allows for precise adjustments to be made as needed.
Once you've set the proper pressure, it's important to gradually increase the planing pressure until continuous shavings appear. This will help ensure that the pressure is not too high and that the drag plate is operating at optimal levels. Additionally, you'll need to adjust the feed speed of the drag plate, which can be done through the check valve located inside the base.
Overall, it's important to approach these adjustments with a positive attitude and a willingness to make small tweaks as needed. With a bit of patience and attention to detail, you can ensure that your drag plate is working exactly as it should and helping you achieve your goals with ease. So don't be afraid to roll up your sleeves and get to work - your hard work will pay off in the long run!
Q:Are you manufacturer or trading company?
A: We are Manufacturer with more than 10 years foreign trade experience. We have our own factory.
Q: How long is the delivery time ?
A: Depend on the quantity.
Q: What is your payment term?
A: Sample order :must be 100% in advance by T/T.
Bulk order :T/T ,30%deposit,70%against copy of B/L. deposit,70%against copy of B/L.
Q: Could i use my own brand ?
A: Yes ,welcome.
Q: Could you provide the after-sale service for the clients after buying your products ?
A: Yes, of course .we supply 24h after-sales service. after delivery, we will track the products for you once every two days,until you get the products. when you got the goods,test them,and give us a feedback. if you have any questions about the problem,contact with us, we will offer the solve way for you.
Q: Do you test all your products before delivery ?
A:Yes,all the products have to pass strict inspection before they go out !
Q: Can you produce base on our drawing &sample ?We may also need our logo on it ?
A :Yes,of course. we do OEM&ODM service. and definitely you can have logo on it.