Customization: | Available |
---|---|
Welding Range: | 2000mm |
Cooling Way: | Air Cooling |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Notice
The butt fusion machine:
The use of machine must be by skill operated.
The heating plate
The heating plate due to the high temperature more than 270ºC,it is suggest to take measure:
Use high-temperature gloves
After butt fusion pipe with pipe, the heating plate must be insert.
Completed the heating plate must be located on the box.
Allowed not to touch on the heating plate.
The planing tool
Before Scraping operation , the pipes and the ground avoiding to dirty the faced pipes ends.
Completed the planing tool must be located on the Support for planing tool & heating plate
Basic frame
Started beforehand that the basic frame on the above mentioned assembling It' suitable for all kinds of pipe to pipe welding.
While starting operating take care to avoid leave legs or arms the movable. It's compulsory to be far from the basic frame.
Take care that all the people around the machine are at safety distance.
The skill operators must observe the safety rules
2000 BUTT FUSION WELDING MACHINE
The main body supports and centres the plastic pipes with two fixed and two movable clamps.
Using the hydraulic pressure on the system, the two pistons on the carrying metal bars move the clamps for and backwards and supply the necessary movement for the welding process.
Model | HDC2000 |
Pipe size(mm) | 1600mm,1800mm,2000mm |
Heating plat Max temp | 270ºC |
Temp deviation in surface(170-250) | ±5ºC |
Max tolerance of welding jointing | 0.3MM |
Max working pressure hydraulic station | 10Mpa |
Working voltage | 380V |
Working frequency | 50-60HZ |
Motor power/voltage of hydraulic station | 4KW / 380V |
Power/voltage of heating plate | 80KW / 380V |
Power/voltage of planning tool motor | 7.5KW / 380V |
Total Power | 91.5KW |
Overall weight of machine(kg) | 51470KGS |
Application& Features:
1.Consist of basic frame, milling cutter, heating plate, hydraulic unit, support.
2.Working environment must be between -40ºC~40ºC.
3.Pressure adjustable range: 0-6Mpa.
4.Heating plate Max. temperture: 270ºC.
5.Suitable for material of PE, PP, PVDF.
Q: Are you manufacturer or trading company?
A: We are Manufacturer with more than 10 years foreign trade experience. We have our own factory.
Q: How long is the delivery time ?
A: Depend on the quantity.
Q: What is your payment term?
A: Sample order :must be 100% in advance by T/T.
Bulk order :T/T ,30%deposit,70%against copy of B/L. deposit,70%against copy of B/L.
Q: Could i use my own brand ?
A: Yes ,welcome.
Q: Could you provide the after-sale service for the clients after buying your products ?
A: Yes, of course .we supply 24h after-sales service. after delivery, we will track the products for you once every two days,until you get the products. when you got the goods,test them,and give us a feedback. if you have any questions about the problem,contact with us, we will offer the solve way for you.
Q: Do you test all your products before delivery ?
A:Yes,all the products have to pass strict inspection before they go out !
Q: Can you produce base on our drawing &sample ?We may also need our logo on it ?
A :Yes,of course. we do OEM&ODM service. and definitely you can have logo on it.