The main body supports and centres the plastic pipes wit one fixed and one movable clamps.
HDL200 Basic Frame |
Power/Voltage |
Size |
Weight |
Volume |
220V |
48*33*81 cm |
23 kgs |
0.129 m³ |
The milling cutter is the tool which clean and smooth the both ends of the pipes before the heating process.
HDT200 butt welding machine is designed for self aligning facer always produces parallel pipe faces.
HDL200 Milling Cutter |
Power/ Voltage |
Size |
Weight |
Volume |
0.9KW/220V |
38*26*36 cm |
7 kgs |
0.036 m³ |
The pipe ends will be heated by this heater before the welding process.
HDT200 butt welding machine PTFE-coated heating element and uniform surface temperature.
HDL200 Heating Plate |
Power/Voltage |
Size |
Weight |
Volume |
1.6KW/220V |
31*6*39 cm |
3.6 kgs |
0.008 m³ |
The protective casing prevents heats loss of the heater and protects the trimmer from external effects.
HDL200 Support |
Size |
Weight |
Volume |
33.5*18.5*45 cm |
2.1 kgs |
0.029 m³ |
Company Profile

OUR MACHINES

EXHIBITION

Product Parameters

P1: Approach and preheating pressure,
P2: Maximum heating pressure,
P5: Welding pressure,
Pt (Drag pressure): pressure necessary to overcome the friction of the machine. It must be measured by the operator
with the pressure gauge of the hydraulic unit.
t1, t2, …, t5: duration of phases 1,2, …, 5.
1- Approach and Preheating Phase. Bring the edges to be welded closer with the thermal element at
the pressure (P1+Pt) so that the edge reaches the dimension provided for by the standard used.
2- Heating Phase. Reduce the pressure to the maximum value P2, sufficient to maintain contact of the edges of the
pipe with the thermal element, for the time t2
Note: The operator, by reducing the pressure, must be careful not to detach the edges from the thermal element. If
this happens, the welding must be repeated.
3- Phase of Extraction of the thermal element. Remove the thermal element at the maximum time t3, without damaging the edges of the two elements to be welded.
4- Phase of reaching the welding pressure. Put the edges in contact, progressively increasing the pressure up to the value (P5+Pt), in time t4. Prevent the soft material from coming out of the surfaces that were approached.
5- Welding Phase. Keep the edges in contact under pressure (P5+Pt ) for time t5.
Do not use water or compressed air to accelerate the cooling of the fusion. If necessary, protect the weld from
rain, wind or excessive solar radiation.

Certifications

FAQ
Q:Are you manufacturer or trading company?
A: We are Manufacturer with more than 10 years foreign trade experience. We have our own factory.
Q: How long is the delivery time ?
A: Depend on the quantity.
Q: What is your payment term?
A: Sample order :must be 100% in advance by T/T.
Bulk order :T/T ,30%deposit,70%against copy of B/L. deposit,70%against copy of B/L.
Q: Could i use my own brand ?
A: Yes ,welcome.
Q: Could you provide the after-sale service for the clients after buying your products ?
A: Yes, of course .we supply 24h after-sales service. after delivery, we will track the products for you once every two days,until you get the products. when you got the goods,test them,and give us a feedback. if you have any questions about the problem,contact with us, we will offer the solve way for you.
Q: Do you test all your products before delivery ?
A:Yes,all the products have to pass strict inspection before they go out !
Q: Can you produce base on our drawing &sample ?We may also need our logo on it ?
A :Yes,of course. we do OEM&ODM service. and definitely you can have logo on it.
After Sales Service